WestmeadHospitalChillerReplacement

Detailed delivery of complex hydraulic upgrades and plant room installations in a live operational environment.

Project Overview

Westmead Hospital Chiller Replacement - photo 1

Background & Context

Goldman Plumbing Services delivered the physical replacement of two large water-cooled chillers in Westmead Hospital's central cooling plant as principal contractor on a live hospital site. Goldman removed and disposed of the failed chillers, recovered the refrigerant, installed the new chillers and stainless-steel pipework, completed the electrical and BMS works, and commissioned the plant.

The Engineering Challenge

Scope of works included: Demolition, removal and disposal of two failed chillers and redundant services; Certified refrigerant recovery; Rigging and installation of two new water-cooled centrifugal chillers; Installation of new 316 stainless-steel chilled-water and condenser-water pipework, valves, flexible connections and insulation; Electrical works (MCC, distribution boards, wiring) and BMS field installation; Seismic / vibration isolation; water treatment, flushing and cleaning; temporary hire chiller during the works; Commissioning, balancing and testing.

Services provided: Mechanical & hydraulic installation; demolition & cranage; refrigerant handling; electrical installation; BMS field works; commissioning & balancing; principal-contractor site management.

Structured Delivery Approach

Key systems and technologies: 2 × water-cooled centrifugal chillers (~3,300 kW each), Trane; 316 stainless-steel chilled & condenser water pipework; Schneider BMS; Belimo valves; Siemens flow metering; Automatic condenser-tube cleaning and side-stream filtration; AS5149 refrigerant monitoring.

Final Handover & Results

Failed chillers safely removed and replaced in an occupied hospital plantroom, restoring redundancy and cooling to critical clinical areas with minimal disruption and full compliance.

Site coordination with facility managers
Isolation and temporary service planning
Certified system handover and documentation
Primary Goal

Operational Continuity & Statutory Compliance