Stagedprojects,zerositedowntime
We coordinate around live Healthcare, commercial and industrial operations to deliver complex hydraulic infrastructure with no interuptions to the facilities operations.

Sydney Metro Tunnel Compressed Air
CompletedInstallation of 17 individual compressed air systems for the tunnel ventilation across the Sydney Metro City & Southwest Line, delivered on an accelerated program.

Austin Health Boiler Replacement
CompletedReplacement of the ageing steam boiler plant at Austin Health in Melbourne — new boilers, burners and flues rigged and craned into a live, occupied hospital, then tested and commissioned with continuity of steam supply.

Mullumbimby Pool Heating
In progressA professionally installed, fully integrated system delivered on site by a licensed contractor with safe, compliant electrical and hydraulic works and minimal disruption to the operating facility.

Stawell Aquatic Centre Heat Pumps
2026A clean, efficient site installation that removes redundant plant and pipework and delivers lower emission electric heating with minimal disruption, the system is fully tested and commissioned for the Council.

Amara Residences
CompletedA complete, compliant warm water, hot water and pool/spa heating installation delivered to practical completion for a seniors-living development, with full warranties and documentation.

Thompson Health Care Oran Park
CompletedA fully installed, solar boosted centralised warm water plant ready for commissioning, delivering hygienic tempered water across a multi-storey Aged Care facility.

Thompson Health Care Woy Woy
CompletedA fully installed, solar boosted centralised warm water plant delivering reliable tempered water for an Aged Care home.

Lobs Hole Grout Plant — Snowy 2.0
CompletedA compact, factory built process water plant installed and commissioned on site to deliver reliable 15°C water to a tunnelling grout plant, with full quality sign off.

Westmead Hospital Chiller Replacement
CompletedFailed chillers safely removed and replaced in an occupied Hospital Plant Room, restoring redundancy and cooling to critical clinical areas with minimal disruption and full compliance.

Westmead Hospital Medical Air
CompletedA fully constructed and certified central medical air plant delivered in a live Hospital environment with no loss of medical air supply during changeover, completing its defect liability period with verified performance.
Discuss an industrial scope?
Our senior estimators can review your hydraulic plans and provide a compliant delivery pathway.

