Background Paths
Background Paths

Stagedprojects,zerositedowntime

We coordinate around live Healthcare, commercial and industrial operations to deliver complex hydraulic infrastructure with no interuptions to the facilities operations.

Sydney Metro Tunnel Compressed Air
Infrastructure

Sydney Metro Tunnel Compressed Air

Completed

Installation of 17 individual compressed air systems for the tunnel ventilation across the Sydney Metro City & Southwest Line, delivered on an accelerated program.

View Technical Case Study
Austin Health Boiler Replacement
Healthcare

Austin Health Boiler Replacement

Completed

Replacement of the ageing steam boiler plant at Austin Health in Melbourne — new boilers, burners and flues rigged and craned into a live, occupied hospital, then tested and commissioned with continuity of steam supply.

View Technical Case Study
Mullumbimby Pool Heating
Aquatic / Government

Mullumbimby Pool Heating

In progress

A professionally installed, fully integrated system delivered on site by a licensed contractor with safe, compliant electrical and hydraulic works and minimal disruption to the operating facility.

View Technical Case Study
Stawell Aquatic Centre Heat Pumps
Aquatic / Government

Stawell Aquatic Centre Heat Pumps

2026

A clean, efficient site installation that removes redundant plant and pipework and delivers lower emission electric heating with minimal disruption, the system is fully tested and commissioned for the Council.

View Technical Case Study
Amara Residences
Residential / Aged Care

Amara Residences

Completed

A complete, compliant warm water, hot water and pool/spa heating installation delivered to practical completion for a seniors-living development, with full warranties and documentation.

View Technical Case Study
Thompson Health Care Oran Park
Aged Care

Thompson Health Care Oran Park

Completed

A fully installed, solar boosted centralised warm water plant ready for commissioning, delivering hygienic tempered water across a multi-storey Aged Care facility.

View Technical Case Study
Thompson Health Care Woy Woy
Aged Care

Thompson Health Care Woy Woy

Completed

A fully installed, solar boosted centralised warm water plant delivering reliable tempered water for an Aged Care home.

View Technical Case Study
Lobs Hole Grout Plant — Snowy 2.0
Infrastructure

Lobs Hole Grout Plant — Snowy 2.0

Completed

A compact, factory built process water plant installed and commissioned on site to deliver reliable 15°C water to a tunnelling grout plant, with full quality sign off.

View Technical Case Study
Westmead Hospital Chiller Replacement
Healthcare

Westmead Hospital Chiller Replacement

Completed

Failed chillers safely removed and replaced in an occupied Hospital Plant Room, restoring redundancy and cooling to critical clinical areas with minimal disruption and full compliance.

View Technical Case Study
Westmead Hospital Medical Air
Healthcare

Westmead Hospital Medical Air

Completed

A fully constructed and certified central medical air plant delivered in a live Hospital environment with no loss of medical air supply during changeover, completing its defect liability period with verified performance.

View Technical Case Study

Discuss an industrial scope?

Our senior estimators can review your hydraulic plans and provide a compliant delivery pathway.

Start Scoping